top of page

New Bench Work

  • trainsaus
  • May 10, 2016
  • 1 min read

Have spent all or part of the last 5 days continuing the bench work, I have now completed the bench work for 1/5th of the lower level.

Continued across the back wall, and have completed the first peninsula. Take a look at the pics, some temporary

divides have been installed to give you an idea on how it divides.


 
 
 

Comments


Featured Posts
Recent Posts
Search By Tags
Follow Us
  • Facebook Classic
  • Twitter Classic
  • Google Classic

© 2023 BY FREE LINE CREATIVE STUDIO. PROUDLY MADE BY WIX.COM

bottom of page