top of page

Construction Begins

  • trainsaus
  • Sep 14, 2015
  • 1 min read

Wood has arrived and time has been allocated, its finally time to make a strat on the new layout !!

I have decided to Use L girder as there are two main zones that have a lot of points / point motors under bench, the Lgirder design allows me to change the position of the timber if requred easily.


 
 
 

Comments


Featured Posts
Recent Posts
Search By Tags
Follow Us
  • Facebook Classic
  • Twitter Classic
  • Google Classic

© 2023 BY FREE LINE CREATIVE STUDIO. PROUDLY MADE BY WIX.COM

bottom of page